MT MURO GOLD MINE—TAILINGS DAM SPILLWAY
Dryka structural engineers led the design of a 200m long spillway, designed to provide emergency runoff to a tailings dam in Indonesia.
A rigid concrete pavement design was proposed and accepted by the client. Dryka Engineers worked closely with hydraulic consultants to ensure runoff forces were accommodated within the spillway structure.